 |
|
 |
 |
 |
|
|
 |
|
|
 |
| |
 |
|
Piping system
reconstruction |
|
| |
|
|
|
|
|
 |
| |
 |
|
Rehabilitation
of wells |
|
| |
|
|
|
|
|
 |
| |
 |
|
Civil full service |
|
| |
|
|
|
|
|
 |
| |
 |
|
Industrial full
service |
|
| |
|
|
|
|
|
 |
|
|
 |
 |
 |
 |
 |
 |
| |
| Inspection of
drainage systems |
 |
 |
Our visiting card: three modern
Van Mobile Units and two portable systems for
piping with different characteristics. Each
Mobile Unit is equipped with recent fittings,
rational preparation and fixed outfit (generators,
plug balloons, PC, accident prevention, etc..)
that make them suited to long lasting interventions
autonomously.
|
|

|
|
|
 |
 |
 |
| |
| |
|
|
| Advantages |
 |
> All video inspections
supply a protocol volume on the observations
drawn up by special programs complying with
German ATV regulations. Each length is classified
and filed in alphanumeric format that can be
immediately rolled out to other digital programs
for the management of systems and territory
(see Mapping).
>
The television systems are a characteristic
of the Mobile Units. They are divided into
Eex systems, underwater systems, standard systems;
each system is equipped with more wagons or
van systems and has all peculiar fittings able
to face all technical needs.
>
The technical preparation of our personnel,
the complete equipment of the Van Units and
the automation of many stages of the observation
protocol carried out on site, are a guarantee
of quality and productivity. |
|
| |
|
|
|
| |
> top |
|
|
| |
|
 |