 |
|
 |
 |
 |
|
|
 |
|
|
 |
| |
 |
|
Piping system
reconstruction |
|
| |
|
|
|
|
|
 |
| |
 |
|
Rehabilitation
of wells |
|
| |
|
|
|
|
|
 |
| |
 |
|
Civil full service |
|
| |
|
|
|
|
|
 |
| |
 |
|
Industrial full
service |
|
| |
|
|
|
|
|
 |
|
|
 |
 |
 |
 |
 |
 |
| |
| Well-loc |
 |
 |
This system, patented in 1997,
moulds a resin-saturated felt sleeve inside the
well in order to improve permanently any break
or perforating corrosion of the jacket.
A simple intervention of a few hours can stop
sand, gravel and polluted water from entering
the well.
|
|

|
|
|
 |
 |
 |
| |
| |
|


|
This system can be used also
in case of cracks and cones and it does not reduce
the diameter of the well, allowing future brushing
and cleaning of scaling.
The manufacture is certified for food use.
System for the relining of wells and underwater
pipes.
Laying of resin-saturated felt sleeves up to
10 mm. width also underwater. Operative diameters:
from 200 mm. up to 1000 mm. Operative depth:
more than 200 m. Maximum static and hydraulic
seal. No diameter reduction. Operative times:
6 hours. |
| |
|
|
| |
|
|
|
| |
> top |
|
 |
 |
 |
|
| |
|
 |